Application of 110 construction method in tail-roadway support technology on fully mechanized mining face
No.1 coal mine of Huangling Mining Co.,Ltd.officially began to adopt the"110 construction method"retaining roadway along goaf technology from 1009 working face to realize the integration of"110 construction method"mining and intelligent mining technology.In order to strengthen the support of the tail-roadway and reduce the labor intensity of the workers,ZQ 1700/16/32 stacking support and support moving robot are used to realize the support and automatic forward movement of the unstable area of the tail roadway in 1009 retaining roadway along goaf.We discuss the application and ex-isting problems of stack support and moving robot in the actual mining process of goaf retaining roadway on 1009 working face.By studying and analyzing the technical parameters of roadway support design and the related mechanism and function of equipment,combined with the problems existing in the implementation process of goaf retaining roadway of 1009 working face,the optimization project and the achievements,the tail-roadway supporting equipment technology of 110 fully mecha-nized mining face is studied.