保护层开采条件下卸压瓦斯治理技术实践

扫码查看
针对下峪口煤矿保护层开采条件下上保护层工作面回采过程中瓦斯超限问题,以及被保护层3号煤层回采工作面瓦斯治理难题,通过对工作面瓦斯涌出预测及分析瓦斯来源,确定合理的瓦斯抽采方案.结合中近距离煤层条件下煤与瓦斯共采技术,确定采用合理布置穿层钻孔抽放卸压瓦斯、采空区埋管抽放瓦斯、顺层钻孔预抽、边抽边采等综合瓦斯治理方案.试验结果表明,4216工作面回采期间未发生瓦斯超限问题;上保护层回采初期(15~35 m)卸压瓦斯抽采进入活跃期,钻孔施工应当超前工作面35 m施工;也表明该综合瓦斯治理方案有效可行,研究成果对韩城矿区突出矿井瓦斯防治具有一定的借鉴意义.
Pressure relief gas control technology under protective layer mining
Aiming at the problem of gas over-limit in the mining process of upper protective layer working face under the conditions of protective layer mining in Xiayukou Coal Mine,and the difficulty of gas control on the working face of protec-tive layer 3 # coal seam,through the prediction of gas emission on working face and the analysis of gas sources,a reasonable gas extraction scheme is determined.Based on the technology of coal and gas co-mining under the conditions of medium and short distance coal seams,we determine the comprehensive gas control schemes such as reasonable layout of through-layer drilling for gas extraction and pressure relief,gas extraction with buried pipe in goaf,pre-extraction along the layer,and sim-ultaneous extraction and extraction.The test results show that the gas over-limit problem did not occur during the mining of the 4216 working face;within the range of 15~35 m in the initial mining stage of the upper protective layer,the pressure re-lief gas extraction enters the active period,and the drilling construction should be carried out at 35 m ahead of the working face.The comprehensive gas control scheme is effective and feasible with referential significance for the gas prevention and control of outburst mines in Hancheng mining area.

gas over limitgas extractionprotective layer miningsimultaneous mining of coal and gaspressure relief gas control

白振华、高品、姬东

展开 >

陕西陕煤韩城矿业有限公司下峪口煤矿,陕西渭南 715400

瓦斯超限 瓦斯抽采 保护层开采 煤与瓦斯共采 卸压瓦斯治理

2024

陕西煤炭
陕西省煤炭工业协会 神华神东煤炭集团有限责任公司 陕西煤业化工集团有限责任公司

陕西煤炭

影响因子:0.204
ISSN:1671-749X
年,卷(期):2024.43(4)
  • 16