首页|大采高工作面回撤通道围岩注浆加固技术实践

大采高工作面回撤通道围岩注浆加固技术实践

扫码查看
针对大采高工作面末采期间回撤通道矿压显现剧烈,巷道支护困难等问题,以小保当一号煤矿112204工作面为背景,对末采回撤通道的围岩控制问题进行了探究.采用理论分析、现场实勘的方法,分析了 112204回撤通道围岩变形原因,明确了注浆加固机理,确定了合理的注浆参数.注浆加固后的112204回撤通道比112201回撤通道的顶板最大下沉量减少了 88.75%,同时末采收尾工作提前5.5 d结束.实践结果表明,对大采高工作面回撤通道进行注浆加固,能有效控制末采阶段巷道变形等问题,对实现安全高效、经济合理的回撤工作具有重要意义.
Grouting reinforcement technology of surrounding rock of retraction tunnel for large mining height working face
Aiming at the problems of severe mine pressure and difficult roadway support during the final mining period of the large mining height working face,the surrounding rock control of the final mining retraction tunnel was studied against the background of the 112204 working face of Xiaobaodang No.1 Coal Mine.The method of on-site investigation was used to an-alyze the deformation of the surrounding rock of the 112204 retraction tunnel,clarify the grouting reinforcement mechanism,and determine the reasonable grouting parameters.The maximum subsidence of the roof of the 112204 retraction tunnel after grouting reinforcement was reduced by 88.75%compared with that of the 112201 retraction tunnel,and the final mining fin-ishing work was completed 5.5 days earlier.The results show that the grouting reinforcement of the retraction tunnel of the large mining height working face can effectively control the deformation of the roadway in the final mining stage,which is of great significance for achieving safe,efficient,economical and reasonable retraction.

large mining height working faceretraction tunnelroof supportsurrounding rock deformationgrouting rein-forcement

冯嘉乐、耿耀强、王子豪、郑哲、潘瑞凯

展开 >

山西能源学院,山西太原 030000

渭南陕煤启辰科技有限公司,陕西渭南 714000

大采高工作面 回撤通道 顶板支护 围岩变形 注浆加固

山西省基础研究计划青年项目陕西省秦创原"科学家+工程师"队伍建设项目

2021030212233922023KXJ-182

2024

陕西煤炭
陕西省煤炭工业协会 神华神东煤炭集团有限责任公司 陕西煤业化工集团有限责任公司

陕西煤炭

影响因子:0.204
ISSN:1671-749X
年,卷(期):2024.43(6)
  • 13