首页|袁大滩煤矿超长工作面覆岩两带发育规律研究

袁大滩煤矿超长工作面覆岩两带发育规律研究

扫码查看
针对超长工作面采动影响下覆岩两带发育规律,以袁大滩煤矿工作面为背景,采用理论分析与离散元的3DEC数值计算软件相结合的方法,研究该条件下覆岩裂隙的分布特征与两带发育规律.结果表明,根据理论计算,得到2号煤层工作面不同采高下2种经验公式的两带发育高度,得出随着工作面采高的增加,工作面采后的导水裂隙带高度逐渐增加,但其裂隙高度的递增幅度逐渐减小的规律;通过3DEC数值模拟,11207超长工作面采高每增加0.2 m所得导水裂隙带高度约增加2.01~3.05 m,超长工作面采高越大,开采高度增加引起裂隙发育高度增幅越小.数值模拟与理论计算基本一致且相互印证.工作面实际开采过程中工作面的开采高度逐渐减小,裂隙带发育高度逐渐降低,覆岩位移量逐渐减小,集中应力逐渐减弱,开采初期需要加强监测,增强防护措施.
Development law of overlying rock two zones on ultra-long working face of Yuandatan Coal Mine
According to the development law of overburden two zones under the influence of ultra-long working face mining,the distribution characteristics and development law of the two zones of overburden rock are studied by combining theoretical analysis and discrete element 3 DEC numerical calculation software based on the background of the working face of Yuanda-tan Coal Mine.The research results show that:According to the results of theoretical calculation,the development heights of the two belts of the two empirical formulas under different mining heights of the working face of No.2 coal seam are ob-tained,and the law that the height of the water-conducting fracture zone in the working face gradually increases with the in-crease of mining height,but the increasing range of the fracture height gradually decreases.Through 3DEC numerical simula-tion analysis,it is found that the height of the water-conducting fracture zone increases by 2.01~3.05 m for every 0.2 m increase in the mining height of 11207 ultra-long working face.The greater the mining height of 11207 ultra-long working face,the smaller the increase in the height of fracture development.The results obtained by numerical simulation are basical-ly consistent with those obtained by theoretical calculation.In the actual mining process of the working face,the mining height of the working face gradually decreases,the development height of the fracture zone gradually decreases,the displace-ment of overlying rock gradually decreases,and the concentrated stress gradually weakens.Therefore,it is necessary to strengthen monitoring and enhance protective measures in the initial stage of mining.

ultra-long working facewater-conducting frac-ture zonecaving zone heightfully mechanized caving miningnumerical simulation

谢涛、张毅、牛勇、李宜霏

展开 >

陕西中能煤田有限公司,陕西榆林 719000

西安科技大学能源学院,陕西西安 710054

超长工作面 导水裂隙带 垮落带高度 综放开采 数值模拟

国家自然科学基金项目陕西省创新能力支撑计划陕煤联合基金

518742312020KJXX-0062019JLZ-04

2024

陕西煤炭
陕西省煤炭工业协会 神华神东煤炭集团有限责任公司 陕西煤业化工集团有限责任公司

陕西煤炭

影响因子:0.204
ISSN:1671-749X
年,卷(期):2024.43(7)