首页|高瓦斯矿放顶煤工作面沿空留巷底板回风岩巷的层位选择

高瓦斯矿放顶煤工作面沿空留巷底板回风岩巷的层位选择

扫码查看
常村煤矿开采3号煤,煤层瓦斯含量高,涌出量大,上隅角瓦斯超限严重,通过采用沿空留巷Y型通风方式解决瓦斯问题.为确保上隅角瓦斯不超限,通过煤层底板岩巷穿层钻孔预抽瓦斯,保证工作面安全生产,实现抽掘采平衡.将2305、2306工作面联合布置,共用一条底板岩巷作为沿空留巷回风巷及抽采巷,通过理论计算、地质条件及实验分析,计算出合理的岩巷位置,确保首次、二次回采时巷道不变形.结果表明,相比煤巷(回风巷),可降低修巷费用,且系统布置简单,具有良好应用前景.
Strata selection of floor return air rock roadway gob-side entry retaining in high gas mine caving face
No.3 coal is mined in Changcun coal mine,the gas content in the coal seam is high,the quantity of gas emission is large,and the upper corner gas exceeds the limit seriously.In order to ensure that the gas in the upper corner does not ex-ceed the limit,the gas is pre-extracted by drilling hole in the rock roadway of coal floor,and the safe production of working face,and realize the balance of extraction and mining.2305 and 2306 working faces are jointly arranged,sharing a floor rock roadway as goaf-along returning roadway's return air lane and extraction lane.Through the theoretical calculation and exper-imental analysis of geological conditions,we determine a reasonable location of rock roadway,ensure the roadway cannot be deformed during the first and secondary mining.Compared with the coal roadway(return air roadway),the cost of roadway maintaining is reduced,and system layout is simple with a good prospect for application.

fully mechanized caving facehigh gas contentgob-side entry retainingY-shaped ventilationlocation of floor rock roadwaypre-extraction of bottom extraction roadway

雷平博、张武涛、原春斌、李树龙

展开 >

陕西开拓建筑科技有限公司,陕西西安 710054

西安绿色矿业研究院有限公司,陕西西安 710054

山西霍尔辛赫煤业有限责任公司,山西长治 046600

综放面 高瓦斯 沿空留巷 Y型通风 底板岩巷位置 底抽巷预抽

2024

陕西煤炭
陕西省煤炭工业协会 神华神东煤炭集团有限责任公司 陕西煤业化工集团有限责任公司

陕西煤炭

影响因子:0.204
ISSN:1671-749X
年,卷(期):2024.43(9)