首页|三河口碾压混凝土高拱坝非线性超载安全度分析研究

三河口碾压混凝土高拱坝非线性超载安全度分析研究

扫码查看
三河口拱坝为国内已建的第二高碾压混凝土拱坝,其结构复杂,综合难度大。通过仿真计算分析非线性超载情况下三河口高拱坝安全度,进行综合技术评判,初步给出拱坝的安全度,与类似高拱坝工程进行对比分析,明确坝体应力状态及发展趋势,提出坝肩岩体的相对薄弱部位,并建议进行相应工程加固处理处理,保证拱坝结构安全运行,为类似工程设计提供非常有益参考。
Study on Nonlinear Overload Safety Analysis of Sanhekou RCC High Arch Dam
Sanhekou arch dam is the second highest roller compacted concrete arch dam in China,which has complex structure and great comprehensive difficulty.The safety degree of Sanhekou high arch dam under nonlinear overload is analyzed by simulation calculation,and the comprehensive technical evaluation is carried out.The safety degree of arch dam is preliminarily given.Compared with similar high arch dam projects,the stress state and development trend of dam body are clarified,and the relatively weak parts of dam abutment rock mass are put forward.It is suggested that the corresponding engineering reinforcement treatment should be carried out to ensure the safe operation of arch dam structure,which provides a very useful reference for similar engineering design.

Sanhekouhigh arch damnonlinear overloadevaluationsafety degree

赵玮、解豪

展开 >

陕西省水利电力勘测设计研究院,陕西 西安 710001

三河口 高拱坝 非线性超载 评价 安全度

2024

陕西水利
陕西省城乡供水管理办公室

陕西水利

影响因子:0.185
ISSN:1673-9000
年,卷(期):2024.(1)
  • 5