鉴江干流部分河段疏浚工程影响分析

扫码查看
通过建立水文数学模型等手段,分析鉴江干流部分河段疏浚工程对河道水动力、水生态等方面的影响情况。研究结果表明:河道疏浚后河道平均高程及深泓高程均有所下降,河道水位降低,河道行洪能力提高;疏浚完成后河道流态整体变化不大,且随着河道行洪断面得到恢复,有利于保持河势的稳定;施工期间以及河道疏浚后,地形地貌发生一定改变,疏浚河床附近水流和河床底质发生变化,将会对河道水生态环境造成影响。
Analysis of the Impact of Dredging Projects on Some Sections of the Main Stream of Jianjiang River
Through the establishment of hydrological mathematical models and other means,the impact of the dredging project on some sections of the main stream of the Jianjiang River on river hydrodynamics,water ecology and other aspects was analyzed.The research results show that after the dredging of the river,the average elevation and deep water elevation of the river have decreased,the water level of the river has decreased,and the flood carrying capacity of the river has improved.After the dredging is completed,the overall flow pattern of the river has not changed much,and as the flood carrying section of the river has been restored,It is conducive to maintaining the stability of the river;during the construction period and after the river is dredged,the topography will change to a certain extent,and the water flow and river bed substrate near the dredged river bed will change,which will have an impact on the river water ecological environment.

Jianjiang main streamriver dredginghydrological mathematical modelimpact analysis

区锦堂、魏俊彪、林浩伟

展开 >

广东省水利水电科学研究院,广东广州 510610

广东省水动力学应用研究重点实验室,广东广州 510610

河口水利技术国家地方联合工程实验室,广东广州 510610

广东省水安全科技协同创新中心,广东广州 510610

展开 >

鉴江干流 河道疏浚 水文数学模型 影响分析

广东省水利科技创新项目2021年省属科研机构稳定性支持专项

2022012021L027

2024

陕西水利
陕西省城乡供水管理办公室

陕西水利

影响因子:0.185
ISSN:1673-9000
年,卷(期):2024.(3)
  • 5