Research on Single Value Analysis of Water Level and Discharge in Wangfuzhou Power Plant Hydrological Station
The hydrological station of the Wangfuzhou Power Plant is located in the tailrace channel of the Wangfuzhou Power Plant.The impact of the impoundment of the Hanjiang Xinji Water Conservancy Project on the tailrace channel of the Wangfuzhou Water Conservancy Project was studied and analyzed.After more than a year of hydrological testing,it has been verified that the real-time water level and flow data provided by Wangfuzhou Power Plant are reliable and highly accurate,and can be used as the main basis for hydrological station alignment and flow push.After excluding other external influencing factors,during the power generation period of the power plant,the data when the water level and flow are stable can be used to establish a single line relationship of water level and flow.It has been verified that the relationship line can be used to calculate the ten-day average flow,monthly average flow and period runoff of hydrological stations.
Wangfuzhou Power Plant hydrological stationwater level and flow relationship linesingle valuehydrologyHan River