首页|基于insar和人工监测新疆BEJ水库变形体稳定性分析

基于insar和人工监测新疆BEJ水库变形体稳定性分析

扫码查看
以新疆BEJ水库为研究对象,通过变形观测分析和理论计算,BX1体垂河向水平位移量为3.78 cm,平均速率0.038 mm/d;垂直沉降总量4.61 cm,平均速率0.046 mm/d;各阶段监测水平位移速率0.038 mm/d→0.023 mm/d→0.034 mm/d→0.015 mm/d→0.010 mm/d;水库蓄水后,BX1变形体发生明显变形,处于蠕动变形状态.建议加强监测预警工作,做好安全保障措施.
Stability Analysis of Deformable Body in Xinjiang BEJ Reservoir Based on Insar and Artificial Monitoring
Taking the BEJ reservoir of Xinjiang as the research object,the vertical horizontal displacement of BX1 body is 3.78 cm and the average rate is 0.038 mm/d through deformation observation and theoretical calculation.The total vertical sedimentation was 4.61 cm,and the average rate was 0.046 mm/d.The monitoring horizontal displacement rate at each stage is 0.038 mm/d → 0.023 mm/d → 0.034 mm/d → 0.015 mm/d → 0.010 mm/d;After the reservoir is filled with water,the deformation of BX1 is obvious and it is in the state of peristaltic deformation.It is suggested to strengthen the monitoring and early warning work and do a good job in security measures.

Insarreservoirdeformable bodystability

许高胜

展开 >

新疆水利水电勘测设计研究院有限责任公司,新疆乌鲁木齐 830001

Insar 水库 变形体 稳定性

2024

陕西水利
陕西省城乡供水管理办公室

陕西水利

影响因子:0.185
ISSN:1673-9000
年,卷(期):2024.(5)
  • 3