首页|峡江水利枢纽大坝安全监测成果分析

峡江水利枢纽大坝安全监测成果分析

扫码查看
介绍峡江水利枢纽建设管理期的监测设施布置情况,并对2018年以来的坝体部分安全监测数据进行分析评价,发现部分监测设备的历史测值浮动较大。主要是因为枢纽监测设备没有及时维护造成的。对大坝的各监测物理量进行监测成果分析,得出峡江水利枢纽大部分监测设施总体运行正常,自动化系统工作总体正常。
Analysis of Dam Safety Monitoring Results of Xiajiang Hydro-junction
The layout of monitoring facilities during the construction and management period of Xiajiang Water Conservancy Project is introduced,and the safety monitoring data of some dam bodies since 2018 are analyzed and evaluated.It is found that the historical values of some monitoring equipment fluctuate greatly.This is mainly due to the lack of timely maintenance of hub monitoring equipment.The monitoring results of each monitoring physical quantity of the dam are analyzed,and it is concluded that most of the monitoring facilities of Xiajiang Water Conservancy Project are in normal operation,and the automation system works normally.

Xiajiang Water Conservancy Projectautomation systemsafety monitoring

张霁云

展开 >

江西省峡江水利枢纽工程管理局,江西 南昌 330095

峡江水利枢纽工程 自动化系统 安全监测

2024

陕西水利
陕西省城乡供水管理办公室

陕西水利

影响因子:0.185
ISSN:1673-9000
年,卷(期):2024.(8)