Analysis of Dam Safety Monitoring Results of Xiajiang Hydro-junction
The layout of monitoring facilities during the construction and management period of Xiajiang Water Conservancy Project is introduced,and the safety monitoring data of some dam bodies since 2018 are analyzed and evaluated.It is found that the historical values of some monitoring equipment fluctuate greatly.This is mainly due to the lack of timely maintenance of hub monitoring equipment.The monitoring results of each monitoring physical quantity of the dam are analyzed,and it is concluded that most of the monitoring facilities of Xiajiang Water Conservancy Project are in normal operation,and the automation system works normally.
Xiajiang Water Conservancy Projectautomation systemsafety monitoring