首页|赞比西河巴图凯水电站施工导流洞出口体型优化研究

赞比西河巴图凯水电站施工导流洞出口体型优化研究

扫码查看
基于物理模型试验,针对巴图凯水电站施工导流洞出口体型进行优化研究,通过多方案试验对比分析,最终提出的直坎+右侧贴角+右侧出口贴角+左侧直墙推荐方案,能够较好地解决下游河道冲刷及下游明渠水流流态问题,使下游河道冲刷深度和下游明渠水翅大幅减小,下游河道冲坑位置远离下游围堰和导流洞鼻坎末端。
Study on Shape Optimization of Construction Diversion Tunnel Outlet of Zambezi River Batukai Hydropower Station
Based on the physical model test,the optimization of the outlet shape of the diversion tunnel for the construction of Batukai Hydropower Station is studied.Through the comparative analysis of multi-scheme tests,the recommended scheme of straight ridge+right angle+right outlet angle+left straight wall is finally proposed,which can better solve the problems of downstream river channel erosion and downstream open channel flow pattern,so that the downstream river channel erosion depth and downstream open channel water wing are greatly reduced,and the downstream river channel scour pit position is far away from the downstream cofferdam and the end of the diversion tunnel nose.

Diversion tunnelnose ridgescouringwater wings

韩冲、刘少斌、宋力

展开 >

陕西省东庄水利枢纽工程建设有限责任公司,陕西西安 710011

中国电建集团西北勘测设计研究院有限公司,陕西西安 710065

导流洞 鼻坎 冲刷 水翅

2024

陕西水利
陕西省城乡供水管理办公室

陕西水利

影响因子:0.185
ISSN:1673-9000
年,卷(期):2024.(9)