首页|碾压混凝土高拱坝6m升层模板工艺研究

碾压混凝土高拱坝6m升层模板工艺研究

扫码查看
根据三河口碾压混凝土拱坝施工工艺及施工节点的要求,为加快大坝碾压混凝土施工进度,在保证施工质量的前提下,通过研究和分析决定采用碾压混凝土6 m升层工艺,解决快速升层的问题。为实现混凝土6 m升层,结合工程实际情况,从模板的选型、加固系统的改造、模板受力计算等方面对模板及锚固件抗拔试验方面进行分析,通过一系列的理论与试验研究,最终确定出6 m升层模板施工方案。
Study on 6m Rising Layer Formwork Technology of Roller Compacted Concrete High Arch Dam
According to the requirements of construction technology and construction node of Sanhekou RCC arch dam,in order to speed up the construction progress of dam RCC,on the premise of ensuring the construction quality,through research and analysis,it is decided to adopt the RCC 6m lifting layer technology to solve the problem of rapid lifting layer.In order to realize the 6 m-rise concrete layer,combined with the actual situation of the project,the pull-out test of the formwork and anchorage parts is analyzed from the aspects of formwork selection,reinforcement system transformation and formwork stress calculation.Through a series of theoretical and experimental studies,the construction scheme of 6m-rise formwork is finally determined.

Roller compacted concrete arch dam6m risestudy on template process

何雪涛、侯钊、邓湘琪

展开 >

陕西省引汉济渭工程建设有限公司,陕西西安 710024

碾压混凝土拱坝 6m升层 模板工艺研究

2024

陕西水利
陕西省城乡供水管理办公室

陕西水利

影响因子:0.185
ISSN:1673-9000
年,卷(期):2024.(9)