特大洪水流量下沟道型弃渣场水土保持措施设计探讨

扫码查看
抽水蓄能电站项目扰动地表面积大,土石方挖填数量大,产生弃渣量大,通常设置的弃渣场规模等级较高,因此弃渣场的规划设计是水土保持工作的重点和难点。根据国家水利部最新文件及相关标准规范要求,以陕西曹坪抽水蓄能电站下库弃渣场为例,结合渣场自然条件分析探讨弃渣场选址、堆置方案选择、排洪方案比选及水土保持措施设计,结果可为同类型工程提供借鉴。
Discussion on the Design of Soil and Water Conservation Measures for Channel-type Waste Dump Under Extremely Large Flood Flow
Pumped storage power station projects disturb a large surface area,involve a large amount of earthwork excavation and filling,and produce a large amount of waste slag.The waste slag sites are usually of a high scale,so the planning and design of waste slag sites are the focus and difficulty of soil and water conservation.According to the latest documents of the Ministry of Water Resources and relevant standards and specifications,this paper takes the waste slag site of the lower reservoir of Caoping Pumped Storage Power Station in Shaanxi as an example,and discusses the site selection,stacking scheme selection,flood discharge scheme comparison and soil and water conservation measures design in combination with the analysis of the natural conditions of the slag site.The results can provide reference for similar projects.

Site selection of slag dumpslag reductionflood discharge from slag dump

张小娟、宁晨东、曹永翔、张保定、权广峰、张乃畅

展开 >

中国电建集团西北勘测设计研究院有限公司,陕西 西安 710065

弃渣场选址 弃渣减量化 弃渣场排洪

2024

陕西水利
陕西省城乡供水管理办公室

陕西水利

影响因子:0.185
ISSN:1673-9000
年,卷(期):2024.(10)