Pipe jacking is a common construction method when pipelines pass under roads,which can reduce interference with traffic and avoid large excavation.Common construction methods for pipe jacking working wells include SMW method,caisson method,etc.Combined with actual cases,this paper analyzes the design points of the working well construction using the inverted well wall method when there are pipelines at the bottom of the working well,in order to provide reference for similar engineering designs.
关键词
顶管工作井/倒挂井壁法/SMW工法/沉井法
Key words
Pipe jacking working well/inverted well wall method/SMW method/caisson method