Application Research on Periodic Water Injection in Shijiahe Water Injection Zone
Since the injection of water,the production capacity of the Shijiahe water injection area has been stable,decreasing slowly,and the injection work has achieved significant results.However,there are still issues with ineffective water injection,rapid increase in water content,and high cost of water injection work.This article adjusts the injection allocation plan and control measures in the Shijiahe water injection area based on the geological characteristics of ultra-low permeability reservoirs and the current water injection development situation,and has achieved good results.
Shijiazhuang River water injection areaUltra low permeability reservoirsInjection plan