Power optimization analysis and renovation of a certain oilfield water injection system
With the production of internal and external adjustment wells in a certain oilfield,and some electric pump wells transitioning from oil production to water injection,the existing water injection power system is no longer able to meet the water injection demand.In response to the above difficulties,the oilfield has conducted research on the water injection system.By adding a new set of water injection system and transforming it into one for use and two for backup,as well as attempting to analyze the dual pump operation power system,the water injection pump has finally achieved the dual use and one for backup operation mode,achieving the goal of oilfield water injection demand.
Water injection demandDual pump operationDual use and one backup