大型蒸发池HDPE土工膜施工工艺及质量控制
Construction technology and quality control of large evaporation pool HDPE geomembrane
章国俊1
作者信息
- 1. 中国石油工程建设有限公司 北京 100120
- 折叠
摘要
结合伊拉克南部拉塔维油田巴士拉天然气轻烃回收处理厂项目实例,介绍了大型蒸发池高密度聚乙烯(HDPE)土工膜的施工工艺和质量控制措施;阐述蒸发池HDPE土工膜的施工工艺和质量管理过程,以确保蒸发池HDPE土工膜的稳定性和安全性,以期望为相关工程提供技术参考.
Abstract
Based on the example of Basra natural gas light hydrocarbon recovery treatment plant in Latawi oil field in southern Iraq,the construction technology and quality control measures of large-scale evaporation pool HDPE geomembrane are introduced in this paper.This paper describes the construction technology and quality management process of evaporation pond HDPE geomembrane,in order to ensure the stability and safety of evaporation pond HDPE geomembrane,in order to provide technical reference for related projects.
关键词
HDPE土工膜/蒸发池/施工控制/质量控制Key words
HDPE geomembrane/Evaporation pond/Construction control/Quality control引用本文复制引用
出版年
2024