Salt paste layer double stage cementing design method and application of construction measures
Two-stage cementing is a common cementing process in drilling.However,there are many difficulties and difficulties in the application of two-stage cementing in salt-paste formation.This paper focuses on the design method of salt-paste layer two-stage cementing and summarizes the successful construction measures in practice,aiming at providing reference for professionals in related fields.
Salt bedTwo stage cementingGrading hoopDesign methodConstruction measure