Plugging removal measures and production system optimization of compound plugging single well
This paper takes the typical well XX03 of HB gas field as the research object,and studies blockage types,plugging locations,plugging agents and reasonable production allocation.It is concluded that well XX03 is a compound blockage with multiple blockages and multiple well segments.And blowing out the plug and using coiled tubing through the well with working fluid of single-well compound plugging measures and critical yield carrying liquid or low yield controlling solid impurities of production system are formed,which successfully apply to the compound plugging of well XX03.Above methods provide experience and reference for the plugging removal measures and production optimization of the same type of Wells.
Compound pluggingBlockage analysisPlugging removal measuresRational distribution of production