Analysis on Basic Upgrading and Reconstruction of Small Capacity Replacing with Large Capacity Wind Turbine Units
In order to replace the small-capacity wind turbine generator system in operation with a large capacity unit,its foundation must be modified and reinforced by expanding the foundation cap and increasing the number of pile foundations to meet the bearing requirements of the new unit.The application of this technical solution provides a reference for similar transformation projects in the future.