上海节能2024,Issue(9) :1468-1475.DOI:10.13770/j.cnki.issn2095-705x.2024.09.010

冷凝热回收地源热泵系统运行仿真研究

Study on the Operation Simulation of Ground Source Heat Pump System with Condensation Heat Recovery

蔡加熙 冯劲梅
上海节能2024,Issue(9) :1468-1475.DOI:10.13770/j.cnki.issn2095-705x.2024.09.010

冷凝热回收地源热泵系统运行仿真研究

Study on the Operation Simulation of Ground Source Heat Pump System with Condensation Heat Recovery

蔡加熙 1冯劲梅2
扫码查看

作者信息

  • 1. 上海建筑设计研究院有限公司
  • 2. 上海应用技术大学
  • 折叠

摘要

根据经验模型与样本数据在TRNSYS平台上建立开发了冷凝热回收地源热泵系统仿真模型,以夏热冬冷地区的上海市宾馆建筑为例,利用开发模型研究了冷凝热回收地源热泵系统长期运行的效益.仿真计算结果表明,与传统地源热泵+燃气锅炉系统相比,冷凝热回收地源热泵系统中长期运行能保持土壤温度稳定,土壤温升减少了 76%,运行20年一次能源标准煤消耗量减少10%,冷凝热回收改造动态投资回收期为4年,具有更好的稳定运行与环保节能效益.

Abstract

Based on the empirical model and sample data,a simulation model of the condensation heat recov-ery ground source heat pump system was established and developed on the TRNSYS platform.Taking Shang-hai City buildings in hot summer and cold winter areas as an example,the development model was used to study the long-term operation of the condensation heat recovery ground source heat pump system.Benefit.Simulation results show that compared with the traditional ground source heat pump+gas boiler system,the condensation heat recovery ground source heat pump system can keep the soil temperature stable during me-dium and long term operation,reduce the soil temperature rise by 76%,and reduce the energy standard coal consumption once every 20 years of operation.10%,the dynamic investment payback period for condensation heat recovery transformation is 4 years,which has better stable operation and environmental protection and energy saving benefits.

关键词

地源热泵/冷凝热回收/土壤温升/多元回归/能耗模拟/技术经济分析

Key words

Ground Source Heat Pump/Condensation Heat Recovery/Soil Temperature Rise/Multiple Re-gression/Energy Consumption Simulation/Technical and Economic Analysis

引用本文复制引用

出版年

2024
上海节能
上海市节能协会,上海市节能监察中心

上海节能

影响因子:0.163
ISSN:
段落导航相关论文