Research on the Construction Technology of Imitation Clear Water Concrete Coating for the Main Tower of Shenzhen-Zhongshan Bridge
The Shenzhen-Zhongshan Bridge located in the Lingdingyang Sea has a large span and is exposed to high temperature,high salt,and high humidity marine environments for a long time.Without being protected,the strength and durability of the concrete will be affected,and corrosion of the steel bars inside the concrete will appear.The main tower of the Shenzhen-Zhongshan Bridge adopts imitation clear water concrete coating technology,which can not only repair the concrete surface and achieve aesthetic effects,but also protect the concrete surface from natural environmental damage and extend its service life.In order to ensure the construction quality and safety of the main tower coating,the construction scheme using a suspended basket construction operation has been determined,and the construction technology and process of imitation clear water concrete coating have been systematically discussed.It provides reference for subsequent anti-corrosion operations of similar projects.
Shenzhen-Zhongshan Bridgesuspended basket constructionimitation clear water concrete