首页|高放废物处置地下实验室现场试验数据管理顶层设计

高放废物处置地下实验室现场试验数据管理顶层设计

Top-level design of field test data management in underground laboratory of high-level radioactive waste disposal

扫码查看
我国高放废物地质处置研发已经进入地下实验室建设的关键阶段.在地下实验室建设和运行期间,将开展大量现场试验,这些试验数据具有传输距离长、采集周期长、数据类型多和数据量大等特点,同时数据质量、安全与可追溯性要求高,数据管理难度较大.通过分析我国高放废物地质处置北山地下实验室现场试验数据特点,以iS3智慧数据服务系统为基础,提出现场试验数据管理顶层设计方法,为现场试验和科研工作顺利开展提供重要的数据管理支撑.
The research and development of high-level radioactive waste geological disposal in China has entered the key stage of underground laboratory construction.During the construction and operation of the underground laboratory,many field tests will be carried out.These test data have the characteristics of long transmission distance,long collection cycle,multiple data types,large data volume,etc.At the same time,the requirements of data quality,safety and traceability are very high,which make the data management very difficult.Through the analysis of the characteristics of the field test data of Beishan underground laboratory,this paper proposed the top-level design method of field test data management based on iS3,which will provide important data management support for the development of field tests and scientific research..

geological disposal of high-level radioactive wasteunderground laboratoryfield test data managementtop-level design

王鹏、王驹、黄树桃、马明清

展开 >

核工业北京地质研究院,北京 100029

中国国家原子能机构高放废物地质处置创新中心,北京 100029

中核高放废物地质处置评价技术重点实验室,北京 100029

高放废物处置 地下实验室 现场试验数据管理 顶层设计

2024

世界核地质科学
核工业北京地质研究院

世界核地质科学

CSTPCD
影响因子:0.463
ISSN:1672-0636
年,卷(期):2024.41(5)