首页|四川红泥坡铜矿三维建模及资源量估算

四川红泥坡铜矿三维建模及资源量估算

扫码查看
根据矿区已有地质勘查成果资料,采用3DMine软件建立矿区地质数据库、矿体模型、块体模型,在软件中运用距离幂次反比法对资源量进行估算,同时和传统的水平投影地质块段法进行对比分析,认为软件中距离幂次反比法估算的结果可靠,方便今后矿山进行各项设计,对于高效开发利用该矿床资源有一定的参考价值.
3D modeling and resource estimation of Hongnipo Copper Mine in Sichuan Province
According to the existing geological exploration results of the mining area,the geological database,ore body model and block model of the mining area are established by using 3DMine software.In the software,the inverse distance power ratio method is used to estimate the amount of resources,and the traditional horizontal projection geological block method is compared and analyzed,It is considered that the estimation results of the software are reliable,which is convenient for mine design in the future,and has certain reference value for the efficient development and utilization of the mineral resources.

3DMine SoftwareHongnipo copper mineGeological modelResource estimation

应鑫、张发银、李贵祥

展开 >

云南冶金资源股份有限公司,云南 昆明 650051

3DMine软件 红泥坡铜矿 地质模型 资源量估算

2024

世界有色金属
有色金属技术经济研究院

世界有色金属

影响因子:0.138
ISSN:1002-5065
年,卷(期):2024.(10)
  • 4