首页|高速铁路改线工程拨接技术研究

高速铁路改线工程拨接技术研究

Research on Connection Technology for High Speed Railway Diversion Project

扫码查看
高速铁路改线通常面临既有铁路运输调配难、专业性强、技术要求复杂、施工难度大等问题.改线施工涉及既有地道拆除、工作坑开挖、箱涵顶进、接触网施工等诸多环节,工程中采取合理的施工方案是保证工程质量的重要环节.针对线路拨接过程中施工复杂、天窗时间短等特点,对改线过程中施工技术和方法进行研究总结,确保铁路运输和工程建设的有序进行,为高速铁路改线施工提供参考和借鉴.
The high-speed railway rerouting usually faces problems such as difficult railway transportation deployment,strong professionalism,complex technical requirements,and difficult construction.The construction of rerouting involves many links such as demolition of existing tunnels,work pit excavation,jacking of box culverts,and construction of contact network.Adopting reasonable construction plans in the project is an important link to ensure the quality of the project.Aiming at the complexity and short daylight time of the line dialing process,the construction technology and methods during the renovation process are studied and summarized to ensure the orderly implementation of railway transportation and engineering construction,and provide reference and reference for the high-speed railway renovation construction.

high-speed railwaydiversion constructionbox culvert jackingline connectioncontact network

田志斌

展开 >

中铁十七局集团第五工程有限公司 山西太原 030032

高速铁路 改线施工 箱涵顶进 线路拨接 接触网

2024

石家庄铁路职业技术学院学报
石家庄铁路职业技术学院

石家庄铁路职业技术学院学报

影响因子:0.355
ISSN:1673-1816
年,卷(期):2024.23(1)
  • 9