首页|软土地质条件下长距离重叠隧道施工技术

软土地质条件下长距离重叠隧道施工技术

Construction Technology for Long-distance Overlapping Tunnels under Soft Soil Geological Conditions

扫码查看
该技术依托天津地铁5号线成林道站~津塘路站区间为上下重叠隧道施工中各项难题,通过模型计算分析、先建隧道结构加强和可拆卸环形支撑加固等综合技术,有效地解决了施工中的各项难题,完成了长距离盾构重叠施工.该项技术成果取得了显著的社会效益及经济效益,对城市地铁设计和施工具有积极的借鉴意义,推广应用价值前景广阔.
This technology relies on various difficulties in the construction of upper and lower overlapping tunnels in the section between Chenglindao Station and Jintang Road Station on Tianjin Metro Line 5.Through comprehensive technologies such as model calculation analysis,reinforcement of the pre built tunnel structure,and detachable circular support reinforcement,it effectively solves various difficulties in construction and completes long-distance shield tunneling overlapping construction.This technological achievement has achieved significant social and economic benefits,and has positive reference significance for urban subway design and construction,with broad prospects for promotion and application value.

small clearanceoverlapping tunnelcomprehensive technology

张鹏

展开 >

中铁十八局集团第五工程有限公司 天津市 300450

小净距 重叠隧道 综合技术

2024

石家庄铁路职业技术学院学报
石家庄铁路职业技术学院

石家庄铁路职业技术学院学报

影响因子:0.355
ISSN:1673-1816
年,卷(期):2024.23(1)
  • 2