由于泵站功能要求和所处环境的特殊性,在已运行水库中新建取水泵站往往涉及施工导流、结构安全、水库保护等诸多难点,泵站的设计方案是否合理直接关系到工程的投入产出效益.文章选取南水北调配套河西支线工程中堤泵站作为分析对象,该泵站位于大宁调蓄水库中堤侧库区滩地内,由于大宁调蓄水库长期蓄水运行,工程施工难度大,对设计过程中围堰填筑、基坑支护、泵站主体结构布置、泵房外墙防水等关键设计要点进行了研究分析,确定了技术可行、经济合理、安全可靠的泵站设计方案.工程已成功实施,可为今后类似工程的设计提供参考.
Analysis of key design points for newly built water-intake pump stations in running reservoirs
Due to the functional requirements of pump stations and the special environment in which they are located,the construction of new water-intake pump stations in running reservoirs often involves many difficulties such as construction diversion,structural safety,and reservoir protection.The rationality of the pump station design scheme directly affects the input-output efficiency of the project.This article selects the embankment pump station of the Hexi Branch Line of the South to North Water Diversion Project as the analysis object,which is located on the beach of the embankment side of the Daning Reservoir.Due to the long-term storage and operation of the Daning Reservoir,the construction difficulty of the pro-ject is high.A study and analysis are conducted on key design points such as cofferdam filling,foundation pit support,pump station main structure layout,and pump station exterior wall waterproofing during the design process and a technically feasible,economically reasonable,and safe and reliable pump station design is are determined.The project has been suc-cessfully implemented and can provide reference for the design of similar projects in the future.

running reservoirsnewly built pump stationsdesign scheme

许光卓、王雷、石二朋、赵亮、张玉洁

展开 >

北京市水务规划研究院,北京 101117

北京市水利规划设计研究院,北京 100048

北京市水务建设管理事务中心,北京 100036

已运行水库 新建泵站 设计方案

2024

水利发展研究
水利部发展研究中心

水利发展研究

影响因子:0.45
ISSN:1671-1408
年,卷(期):2024.24(11)