In order to reduce the cost of inland waterway construction projects,the focus of cost management optimization has been determined based on the engineering cost,and corresponding optimization ideas have been designed based on current cost management issues.In addition,to ensure the smooth implementation of cost management optimization plans,research has also designed safeguard measures.The results showed that the total engineering cost before the optimization of the plan was 765.1543 million yuan,while the total engineering cost after optimization was 688.7306 million yuan,indicating that the optimization plan and guarantee plan designed by the research institute can effectively save costs.
关键词
水运/成本管理/工程造价/保障措施/估算/概算
Key words
water transportation/cost management/engineering cost/safeguard measures/estimate/estimate