Risk Decision Analysis Based on Reinforcement Construction Technology for Siuice Removal
The study focuses on the issue of risk reduction and reinforcement of water gates,using a risk decision analysis method that comprehensively considers multiple factors such as safety,applicability,and durability.The failure probability of each factor ranges from 0 to 0.16.During the process of increasing frequency p from 0 to 99.3%,the precipitation gradually decreased from the highest 650mm to around 130mm.The water level and flow data from 1985 to 2015 at the Heitz estuary gate indicate that the highest water level occurred in 2007 and 2010,reaching 31.43 and 31.47 meters.These results reveal the effectiveness of reinforcement construction technology in practical applications.This work has important practical significance for improving the operational safety and stability of water gates,and reducing engineering risks.
water gatedecision analysisexclusionreinforcementwater conservancy facilities