首页|基于暴雨洪水管理模型的菊树北涌排涝评估及综合整治

基于暴雨洪水管理模型的菊树北涌排涝评估及综合整治

扫码查看
为了解决菊树北涌地区的内涝问题,推进排涝综合整治工程建设,提出暴雨洪水管理模型,并应用设施景观设计技术,完善水景观.通过降雨重现期,对排涝系统进行模拟分析,与改造前相比,重现期为50 年时总削减率超过20%,洪水下渗量呈增加趋势;当重现期为50 年时,改造后的径流量比改造前的径流量削弱20m3.结果表明,基于暴雨洪水管理模型的景观设计技术能够有效解决排涝问题.
Evaluation and Comprehensive Treatment of Flood Drainage in Jushu Beichong Based on Rainstorm Flood Management Model
In order to improve the waterlogging problem in Jushu Beichong area and promote the construction of comprehensive waterlogging control project,the rainstorm flood management model was studied and proposed,and the facility landscape design technology was applied to improve the water landscape.Through the rainfall recurrence period,the simulation analysis of the drainage system was carried out.Compared with the pre-reconstruction,the total reduction rate was more than 20%when the recurrence period was 50 years,and the flood infiltration showed an increasing trend.When the recurrence period was 50 years,the runoff after the reconstruction was reduced by 20m3 compared with the pre-reconstruction.The results show that landscape design technology based on storm water management model can effectively improve the problem of flood drainage.

SWMM modelwaterlogging controlLIDrainfall recurrence periodrainfall runoff

林希璐

展开 >

广东省水利电力勘测设计研究院有限公司,广州 510635

SWMM模型 排涝整治 LID 降雨重现期 降雨径流量

2024

水利科技与经济
哈尔滨市水务科学研究院 哈尔滨市水利规划设计研究院 哈尔滨市水利学会

水利科技与经济

影响因子:0.274
ISSN:1006-7175
年,卷(期):2024.30(3)
  • 10