Research on Measurement Technology for Inland Waterway Engineering
In response to the complex and diverse terrain of inland waterways and the insufficient accuracy of traditional measurement methods,a new comprehensive measurement technology for inland waterway engineering is designed by integrating terrain measurement technology,trajectory measurement technology,water level observation technology,flow velocity and direction measurement technology,and data preprocessing technology.The experimental results show that the plane error of each beach group does not exceed 0.23m,and the elevation error is also controlled within 0.26m.The maximum position offset and maximum elevation error are also less than 0.25 and 0.3m,respectively.In summary,the comprehensive measurement technology proposed in this study for inland waterway engineering has high measurement accuracy and high practical application value.
ADCP data preprocessinginland waterway engineeringmeasuring technique