Risk Assessment and Management Strategies for Flood Control Throughout the Life Cycle of River Embankment Projects
In order to address the risk assessment and management issues of river embankment engineering,the key risk points throughout the entire lifecycle were studied and analyzed.At the same time,risk management theory was introduced and a risk based standardized management system for river embankment engineering was designed.The results show that the assessment coefficients for the life,economic and environmental risk factors of the anti filter blanket treatment plan were 0.93,0.85 and 1.15,respectively.The final assessment score was 785.64 points,which was higher than the qualified standard score.This indicates that the anti filter blanket treatment scheme is feasible in flood control and proves the effectiveness of the risk assessment and management system.This provides a method reference for flood prevention and rescue of embankment engineering.