Optimization and Application of BIM Forward Design in Lot IV of the Tingzikou Irrigation Area Project(Phase 1)
The irrigation area of Tinzikou project have a long route,wide scope,and numerous canal structures.With the widespread application of BIM technology in the field of engineering construction,utilizing BIM for three-dimensional forward design and optimization in irrigation area design can help improve the quality of irrigation area design and enhance the management level of the irrigation area.In combination with the Tingzikou Irrigation Area Project(Phase 1),this paper introduces the application of three-dimensional parametric forward design of hydraulic structures,three-dimensional excavation forward design with BIM technology for tunnel inlet and outlet,optimization design of underdrain in deep-cut works,three-dimensional forward design of crossing sections of main tunnel and adits,and the application of BIM models in the operation and maintenance stage,which provide experience for the design of similar projects.
Tingzikou Irrigation AreaBuilding Information Model(BIM)BIM forward designBIM+GISthree-dimensional designparametric design