Research on application of BIM technology in construction period of long-distance water diversion project
Taking the construction period of the Central Yunnan Water Diversion Project as a case,in view of the problems of long-distance construction,difficulties in on-site supervision and multi-stakeholder communications during construction period of the long-distance water diversion project,a BIM standard system is developed according to the project features and management requirements.The BIM model is developed to realize BIM collaboration,and to carry out construction simulation and visual disclosure.BIM technology is applied to achieve electronic sandbox and virtual roaming,and the BIM model integrates construction period data to the"Smart Dianzhong Water Diversion"construction management information system.GIS technology is integrated to carry out auxiliary management and supervision of engineering construction behaviors,so that the collaborative monitoring and control of safety quality,investment cost control,progress control,construction image,on-site monitoring and other core contents during the project construction period,can be jointly supervised and visual chart display is realized.Standardized management can thus be implemented during the construction period of the project,which can provide reference for BIM applications in long-distance water diversion projects.
BIM applicationlong-distance water diversion projectsBIM standard systemBIM collaborationmodel developmentauxiliary managementelectronic sandboxconstruction period