全过程造价控制在电力工程中的实施路径探讨

扫码查看
全过程造价控制包括事前、事中和事后三个阶段.其中,事前造价控制由设计单位负责,包括勘察、制图和概算等环节;事中造价控制发生在施工过程中,决定实际造价与计划造价的匹配程度;事后造价控制发生在竣工验收环节,影响项目审计.在实施全过程造价控制时需要分清主次,重点关注关键阶段和环节,以提高应用价值,保障电力供应稳定、可靠.
Discussion on the Implementation Path of Whole Process Cost Control in Electric Power Engineering
The whole process cost control includes three stages:before,during and after.Among them,the ex ante cost control is responsible for by the design unit,including investigation,drawing and budget estimation;the ex post cost control occurs in the construction process,which determines the degree of matching between the actual cost and the planned cost;the ex post cost control occurs in the completion and acceptance link,which affects the project audit.In the implementation of the whole process of cost control,it is necessary to distinguish the main and secondary,focusing on the key stages and links,in order to improve the value of the application,to ensure a stable and reliable power supply.

whole processcost controlelectric power engineeringimplementation path

梁洁、余弦

展开 >

广西电网有限责任公司贵港供电局,广西贵港 537100

广西自然资源职业技术学院,南宁 530028

全过程 造价控制 电力工程 实施路径

2024

数码设计

数码设计

ISSN:1672-9129
年,卷(期):2024.(2)
  • 5