首页|10 kV配电网线路间隔棒安装机器人设计

10 kV配电网线路间隔棒安装机器人设计

扫码查看
为解决配电网线路由于大风振动等原因导致的线间空气绝缘击穿等问题,在分析配电网间隔棒安装工况的基础上,提出了远程可控间隔棒安装机器人的总体设计方案.利用三维建模软件分别设计了机器人的行走系统、安装紧固系统、绝缘连杆、金具和间隔棒,实现了该机器人的组装和调试,并完成配电网线路的间隔棒安装试验.结果表明:该机器人能够远程自动完成上线、行走、安装和固定等间隔棒安装操作.
Design of Spacer Bar Installation Robot for 10 kV Distribution Line
In order to solve the problems of air insulation breakdown between lines caused by strong wind vibration and other reasons in the distribution network,based on the analysis of the installation conditions of the distribution network spacer,the overall design scheme of the remote controllable spacer installation robot is proposed.Using 3D modeling software,the robot's walking system,installation and fastening system,insulating connecting rod,fittings and spacer rods were designed respectively,the assembly and debugging of the robot were realized,and the spacer rod installation experiment of the distribution network line was completed.The results show that the robot can remotely and automatically complete the spacer installation operations such as on-line,walking,installation and fixing.

10 kV distribution network linespacer bar mountingrobotmachine configuration

尹杰、邓杰、鄂世宝、代旭波、胡楠、花广如

展开 >

云南电网有限责任公司 曲靖供电局,云南 曲靖 655000

华北电力大学河北省电力机械装备健康维护与失效预防重点实验室,河北 保定 071003

华北电力大学保定市先进设计与智能制造重点实验室,河北 保定 071003

10 kV配电网线路 间隔棒安装 机器人 机构构型

云南电网公司科技项目计划河北省研究生教育教学改革研究项目河北省高等教育教学改革研究项目

YNKJXM20220079YJG20231242021GJJG420

2024

机械工程与自动化
山西省机电设计研究院 山西省机械工程学会

机械工程与自动化

影响因子:0.251
ISSN:1672-6413
年,卷(期):2024.(3)
  • 7