In order to improve the monitoring,monitoring and automatic control effect of the coal mine heating system,realize centralized control of various dispersed units such as the industrial square heat exchange station and the shaft air heating station in the coal mine heating system,collect and monitor real-time data parameters and control equipment,Jinhuagong Mine Heating Department decided to optimize the overall design of the heating monitoring and monitoring system based on PLC.Through practical application results,it is found that this optimized design effectively improves the centralized control level of each decentralized monitoring and monitoring system unit of the heating system.Not only is the monitored and collected data content comprehensive,but also relatively accurate.While the level of automation control is significantly improved,heating efficiency has been significantly improved.
关键词
供热系统/监测监控系统/PLC控制/优化
Key words
heating system/monitoring and control system/PLC control/optimization