To effectively improve the gas control in the working face of soft coal seams,taking No.150508 working face in Maijie Coal Mine as the research background,numerical simulation,theoretical calculation,and on-site application were combined to study the fissure development of surrounding rock and gas control model during the mining of the working face to propose a con-trol model of"high drainage roadway+roof fissure holes+ventilation air methane".We used nu-merical simulation to optimize the construction parameters of roof fissure drilling and high drain-age roadway layout levels and then conducted on-site application research.The results show that the development height of the caving zone and the fissure zone is 16.8 m and 54.5 m,respective-ly;the optimal arrangement layer for high drainage roadway and roof fissure ranges from 16.8 to 35.6 m and from 20 to 40 m,respectively;under the control model of"high drainage roadway+roof fissure hole+ventilation air methane",the average volume fraction of gas in the upper corner is 0.26%and average gas drainage rate in the working face is 64%.The gas control has reached the expected goal,ensuring safe mining.
gas controlfracture zone heighthigh drainage roadway