首页|三聚盛9105工作面复采设计

三聚盛9105工作面复采设计

扫码查看
为了保证矿井正常的开采,三聚盛煤业计划对 9105 工作面进行复采.在复采时,面临着 9105 工作面周围的废弃小煤窑、地表裂缝和矿井水问题.针对这些问题制定了一系列的安全措施,主要包括复采巷道围岩加固及支护和复采区工作面围岩控制,可以为工作面的复采提供一定的参考.
Remining Design of Sanjusheng 9105 Working Face
In order to ensure the normal mining of the mine,Sanjusheng Coal Industry Co.,Ltd.plans to carry out remining 9105 working face.In the process of remining,it is faced with the problems of small abandoned coal kilns,surface cracks and mine water around 9105 working face.In view of these problems,a series of safety measures were formulated,including the surrounding rock reinforcement and support of the roadway and the surrounding rock control of the working face in the mining area,which can provide certain reference for the working face.

coal miningremining of working facesurrounding rock reinforcementsafety technology

刘超

展开 >

山西煤炭运销集团三聚盛煤业有限公司,山西 娄烦 030300

煤矿开采 工作面复采 围岩加固 安全技术

2024

能源与节能
山西省能源研究会 山西省节能研究会

能源与节能

影响因子:0.561
ISSN:2095-0802
年,卷(期):2024.(1)
  • 8