Water Control Countermeasures of Hongqigou-Shenshuitan Gold Mine in Tsaidam Basin
The industrial site setup,drainage system status and hydrogeological conditions of Hongqigou-Shenshuitan Gold Mine in Wulonggou Mine area were studied,and the safety and reliability of industrial site selection,protection and detection measures for mineral mining,and the layout of waste dump was analyzed.It can help prevent mine safety accidents such as mine flooding and ensure mine safety production and construction operations to use the large well method and analogy method to calculate the total displacement required by the mine,improve the design of the drainage and flood interception ditch of the waste dump and the underground drainage and drainage system of various mining areas in accordance with relevant norms and standards,and check the drainage capacity of the drainage ditch,scientifically and reasonably propose the prevention and control measures for sudden water inrush on the surface and underground.
underground mineswater control strategieshydrogeological conditionssurface waterproofunderground drainage system