掘进工作面稳定性研究
Study on Stability of Driving Face
吴天阳1
作者信息
- 1. 霍州煤电集团晋北煤业有限公司,山西 静乐 035100
- 折叠
摘要
以霍州煤电集团晋北煤业掘进工作面稳定性为研究背景,讨论了巷道掘进工艺中的分次成巷法和一次成巷法,同时根据平行作业,建立了掘进-支护系统动力学模型.实践工程中接触力稳定,围岩处于稳定状态,综合机械化掘进工艺提高了劳动效率,降低了成本,对于维护掘进工作面稳定性有积极作用.
Abstract
Based on the research background of the stability of the heading face in Jinbei Coal Industry Co.,Ltd.,Huozhou Coal Electricity Group,the divided tunneling method and the one-time tunneling method in the tunneling process were discussed,and a dynamic model of the tunneling and support system based on parallel operations was established.In practical engineering,the contact force is stable,and the surrounding rock is in a stable state.The comprehensive mechanized tunneling process improves labor efficiency,reduces costs,and has a positive effect on maintaining the stability of the heading face.
关键词
掘进工作面/一次成巷法/平行作业/系统动力学Key words
excavation face/one-time tunneling method/parallel operation/system dynamics引用本文复制引用
出版年
2024