Due to the large land area and deep buried communication cables,it is extremely difficult to locate the fault point in new energy stations.If necessary,secondary excavation and replacement of the ground are required.How to solve the communication problem between equipment has become a challenge for new energy enterprises.Two wireless transmission schemes were introduced and applied to the power prediction system and combiner box communication system of new energy electric fields to achieve data acquisition of wind measurement towers and combiner boxes.Compared with the traditional cable replacement scheme,the proposed scheme has the advantages of low cost,fast construction,reliable operation,no damage to grassland vegetation,and simple maintenance.
关键词
新能源场站/无线传输/功率预测/汇流箱
Key words
new energy station/wireless transmission/power prediction/combiner box