Optimal Design Scheme of Coal Mine Production Scheduling Management
Aiming at the logistics transportation of coal mines,an optimization design scheme of coal mine production scheduling management was introduced.According to the specific situation of coal mine logistics transportation,a multi-objective scheduling model of coal short transfer transportation was constructed,and on this basis,constraints were set up for the scheduling process from many aspects.Finally,the improved multi-objective genetic algorithm was used to calculate the scheduling model to obtain the optimal solution,that is,the best scheme of coal short transfer transportation scheduling.Through the application of the scheme,the efficiency of coal mine logistics transportation can be improved,which is of certain application value.
production scheduling managementshort transfer transportationmulti-objective scheduling modelmulti-objective genetic algorithm