Parameter Calculation and Experimental Research on Active Support Scheme for 2104 Working Face Mining Roadways
The aim was to explore the parameter calculation and experimental research of active support schemes for mining tunnels,in order to improve the safety and efficiency of underground engineering.By introducing the engineering overview of the mining roadway,the active support technology of the mining roadway and its application in practical engineering were discussed in detail.In terms of parameter calculation,a detailed analysis was conducted on the key parameters related to the active support scheme,providing calculation methods and theoretical basis,and providing specific calculation results.Through construction research on active support schemes,the feasibility and effectiveness of their practical application were evaluated,potential problems and challenges were explored,and accurate conclusions were drawn.