首页|厚煤层小煤柱沿空掘巷围岩控制技术研究

厚煤层小煤柱沿空掘巷围岩控制技术研究

扫码查看
程庄煤矿 15#煤层原采用 25~30m大煤柱护巷,导致临空巷道动压大、维护困难,且资源浪费较严重.以15308 综放工作面为工程背景,通过使用理论计算、工程类比等手段,确定了最佳小煤柱护巷尺寸为 6m,同时采用爆破切顶、优化巷道支护参数,并配合注浆加固、喷浆、卸压槽等诸多措施,实现了小煤柱的沿空掘巷,既降低了临空巷道动压对巷道的影响,又减少了煤炭资源的浪费,延长了矿井服务年限.
Surrounding Rock Control Technology for Gob Side Entry Driving with Small Coal Pillars in Thick Coal Seam
The 15#coal seam in Chengzhuang Coal Mine originally used 25-30 m large coal pillars to protect the roadway,which was difficult to maintain due to high dynamic pressure and severe resource waste.Taking the 15308 fully-mechanized top coal caving face as the engineering background,the optimal size of the small coal pillar support roadway was determined to be 6 m through theoretical calculations,engineering analogies and other methods.By using blasting to cut the roof,optimizing the roadway support parameters,and cooperating with grouting reinforcement,spraying,and pressure relief grooves,the gob side entry driving with small coal pillars was achieved,which not only reduced the impact of dynamic pressure on the roadway in the goaf,but also reduced the waste of coal resources and extended the service life of the mine.

small coal pillargob side entry drivingsurrounding rock control

侯宇峰、高翔宇

展开 >

阳泉市燕龛煤炭有限责任公司,山西 阳泉 045000

山西煤炭运销集团科学技术研究有限公司,山西 太原 030000

小煤柱 沿空掘巷 围岩控制

2024

能源与节能
山西省能源研究会 山西省节能研究会

能源与节能

影响因子:0.561
ISSN:2095-0802
年,卷(期):2024.(8)