双龙煤矿200工作面水害综合勘探研究
Comprehensive Exploration of Water Damage in 200 Working Face of Shuanglong Coal Mine
杨惟博1
作者信息
- 1. 陕西双龙煤业开发有限责任公司,陕西 延安 727300
- 折叠
摘要
双龙煤矿 200 工作面区域水害危险性不详,为确定区域内水害危险性,采用物探结合钻探的方法进行综合研究.物探采用高密度电法勘探,确定低阻异常区 9 处,共计 4.75×104 m2;采用钻探进行水量验证,确定区域水文地质类型为以裂隙充水为主的简单型.通过综合勘探可知,200 工作面区域水害危险性小、水量小.
Abstract
The water hazard in 200 working face of Shuanglong Coal Mine was unknown.In order to determine the water hazard in the area,the method of geophysical exploration combined with drilling was applied for comprehensive study.High-density electrical exploration was used to determine 9 low-resistivity anomaly areas,with a total of 4.75×104 m2.The water quantity was verified by drilling,and the regional hydrogeological type was determined to be simple type dominated by fissure water filling.Through comprehensive exploration,it can be seen that the water damage risk and water quantity in the 200 working face area were small.
关键词
矿井水害/高密度电法/钻探/水害危险分析Key words
mine water damage/high-density electrical method/drill/water hazard analysis引用本文复制引用
出版年
2024