The current situation and existing problems of the outer dam slope of the regulating reservoir and the right bank slope protection of the Hulu River were analyzed.Based on the flood control standards of the regulating reservoir,the slope on the right bank of the river has been protected.The design and calculation process of slope stability and protection,as well as the treatment measures for bank slopes were elaborated.
关键词
引洮供水/调蓄水池/护坡/稳定/洪水位
Key words
Tao River Water Diversion Project/regulating reservoir/slope protection/stability/flood level