Analysis of Embankment Design Plan for Xiushui River Management Project
In order to improve the flood control capacity of both sides of the Xinmin section of the Xiushui River and solve the existing problems of poor soil quality,weak anti-scouring ability and potential flood control risks of water damage in the current embankment,it is necessary to implement embankment treatment projects.Starting from the actual engineering,the original embankment was heightened and thickened,and protective measures were taken to lay geomembranes on the upstream face for the embankment sections whose penetration did not meet the specification requirements.Anti-slip verification and scour calculations were also performed to provide a reference for the design of embankment projects in similar areas.
Xiushui Riverembankmentheightening and thickeningengineering design