Analysis of Flood Control Planning for Huangfuchuan Watershed in Fugu County
Huangfuchuan watershed is a high incidence area of rainstorm in the middle and upper reaches of the Yellow River.In order to effectively improve the flood control capacity of Huangfuchuan watershed,based on the general situation of the river basin and historical flood disasters,and the analysis of flood characteristics and flood control status,according to the weak links of flood control exposed by the flood situation in the river basin in recent years and the new requirements of economic and social development for flood control,the planning of the flood control system of Huangfuchuan was discussed.It was proposed that the planning should focus on the river sections involving towns and energy bases,and constructs the"bank strengthening and beach protection"flood control engineering system and non-engineering measures combining levees,bank revetment and banket,which provides a reference for the flood control planning and construction of river basins in the Loess Plateau.
flood control planningengineering systemnon-engineering measureHuangfuchuan watershed