横泉水库库区后东旺坪村浸没问题分析评价
Analysis and Evaluation of Immersion Affect of Houdongwangping Village in Hengquan Reservoir
王二文1
作者信息
- 1. 山西省水利水电勘测设计研究院有限公司 山西太原 030024
- 折叠
摘要
横泉水库建成蓄水运行以来,发现库区周围部分房屋墙体开裂、脱落、房屋内地面和墙体潮湿等问题.通过实地浸没影响专项勘察工作,对水库正常蓄水位(1 134 m)时,后东旺坪村可能发生的浸没地段、范围、类型及危害程度进行预测和评价.
Abstract
Since the completion and operation of the Hengquan Reservoir,it has been found that the walls of some houses around the reservoir have cracked or fallen off,and the ground and walls inside the houses are damp.Through a special survey on the impact of on-site immersion,the possible immersion areas,scope,types,and degree of harm that may occur in Houdongwangping Village when the reservoir water level is at the normal storage level(1 134 m)were predicted and evaluated.
关键词
浸没影响/正常蓄水位/横泉水库Key words
immersion affect/normal storage level/Hengquan Reservoir引用本文复制引用
出版年
2024